Payment:
L/C, T/TProduct Origin:
ChinaColor:
CustomizedShipping Port:
Xiamen,Lead Time:
15-35 days
Production Description
Production Information
In the investigation of the cooperation methods and processes in the current domestic curtain wall, basically, after the building shape and layout scheme have been determined, the architect makes the basic facade division scheme, and then hands it to the curtain wall manufacturer to complete the construction drawing design. The main consideration is the structural installation and Prevention of cold bridge.
Products Show